Other Research of Yohchia Chen
-
"Bridge Superstructure Analysis Improvements and Retrofit Procedures",
in cooperation with Drs. H. West, A. Scanlon, and T. Krauthammer, $290,000,
PennDOT, 1990-1992.
-
"Lateral Distribution of Vehicle Live Loads", $5,000, Prestressed
Conc. Assoc. of PA. (PCAP), 1992-1993.
-
"Vibration Properties of Precast Building Floors", $12,000, Precast/Prestressed
Concrete Institute (PCI) and Penn State University, 1992-1993.
-
"Development of FORTRAN Codes for Box Culvert, Retaining Wall, and Integral
Abutment Designs by AASHTO LRFD", $40,000, PennDOT and Modjeski and
Masters, Inc., 1994-1996.
-
"Aluminum Bridge Decks - Finite Element Analyses, Verifications with
Tests, and Development of Design Criteria", $15,000, Reynolds Metal
Co. and Modjeski and Masters, Inc., 1995-1996.
-
"Development of Rational Release Strength Criteria", $10,000, Precast/Prestressed
Concrete Inst.(PCI), 1995-1996.
-
"Improving Bridge Design Efficiency Using Refined Lateral Load Distribution",
$10,000, Prestressed Concrete Association of PA (PCAP), 1995-1996.
-
"Studies on the Construction Technology of Rock Tunnels: Phase
I - Study on Decision Support System for Drill and Blast Technology of
Tunnels", $131,800 (approx.), National Expressway Engineering Bureau
(NEEB), Ministry of Transportation & Communications (MOTC), Taiwan,
in cooperation with Drs. S. Leu and C. N. Chen at National Taiwan Institute
of Technology, 1994-1996.
-
"New Holland Roof Truss Analysis", $4000, Providence Engineering
Corp., PA., Feb.-April 1996.
-
"Investigation of Design Specifications and Framework Study on Limit
States Design for Taiwan Bridges", $37,600 (approx.), Engineering Research
Foundation, SinoTech Engineering Consultants, Inc., Taipei, Taiwan, 1996.
Return