Day Tech Summit - Kodak Gallery 5/28/08

| | Comments (0) | TrackBacks (0)
An atypical  but effective implementation of cq
Damon Brennen

Challenges
  • CQ installed, but not fully implemented
  • Project Team Turnover
  • Mgmt on to the next new thing

How we overcame those challenges

  • babysteps

Timeline

  • pilot
  • procrastinator campaign
  • full campaign with cms
  • 90% of bc slots managed by Day (small changes, few new pages)
  • extended biz users
  • business as usual end of rollout

Published over 900 slots

  • all us
  • target
  • canada
  • eu
  • easyshare software
  • all avail meta slots
  • all advertising/headers and meta slots

 

Marketing

  • workflow removed bottleneck
  • reduced publishing promo speed
  • test, update, site content landing pages - ability to "play around"
  • eu stays in sync with us

Choose a template based on slot size

create a page with slot id

 

Strengths

  • easy to use
  • easy to maintain
  • small project team

 

0 TrackBacks

Listed below are links to blogs that reference this entry: Day Tech Summit - Kodak Gallery 5/28/08.

TrackBack URL for this entry: https://blogs.psu.edu/mt4/mt-tb.cgi/9953

Leave a comment

Technorati

Technorati search

» Blogs that link here

May 2008

Sun Mon Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Recent Comments

Archives

Sign In

Pages