LIBERTY Projects Page
Work done during the summer of 2016
The links below reflect
work done between 2009 and 2016
Forward
Deck
Anchor
Roller, Rail Bright Work
Pilot House
Vents, Bench Seat, Opening Hatch, Hand Rails, Trim Replacement,
Cabin
Top Painting, Breeze Booster, Stem issues
Side
Decks
Core
Replacement, Rail Cap Repair, Davit Back Up Plates, Power Inlet Locations,
Painting
Back
Deck (Veranda)
Cushion
Replacement, Sliding Doors, Sill, Trim, Center Seat Support, Enclosure
Cockpit
Table Issues, Painting, Hatch Drain, Rudder Post, Hatch Rebuild
Fly
Bridge & Boat Deck
Core
Replacement, Bow Thruster Control Cover, Compass Mount, AIS Antenna Mount,
Flybridge Removal, Flybridge Painting, Horns
Light
Boards, Stern Light, Davit Mount Problems, Stack Base Issues,
Mast Step Replacement, Skylight Refinishing, Spar
Painting, Folding Spreader,
Boat Deck
Painting, Deck Hardware Removal, Hatch Painting, PVC Edging,
Dinghy Painting &Cover, Electric Outboard, Steadying
Sail, Boom Replacement, Dinghy Launching
Boat Deck Dock Box, Fly Bridge Cushions & Covers, Cell Antenna, Mast Cradle
Forward
Cabin (Owners Stateroom)
Refinishing, Berth
Modifications, Hanging Locker Rebuilding
Pilot
House
Helm Seat
Region Refinishing, Vent Replacement, Clock & Barometer, Electrical Panel
Modifications
AC Sub Panel, Stereo, Pilot House Refinishing, Reverse Image Camera, Breaker Box Lighting and Labels
Galley
Head
Tub Removal,
Shower Addition, Vacuflush Head, LED Lights
Main
Salon
Re-upholstery,
Refinishing, Screens, Bilge Pump Monitor, Forced Air Heat
Saloon Sole
Hatch Refinishing, Gas Lift Cylinders
Main
Hold (Basement)
Engine
room Fuel Tanks, Sound Insulation, AC unit
Engine
Room
Air
Conditioner Water Intake, Water Heater, VacuFlush,
Alternator Belt Project,
Oil Change Pump, Rub
Rail Bolt Leaks, Holding Tank & Fuel Tank Removal & Cleaning
Sound Insulation
Installation, AC Issues Revisited
Rechargeable Holding Tank Filter
Rudder
Rudder Replacement, Stern Thruster