Pre-2003 Research

If you'd like a copy of any these articles, please email me.

Souza, G., M. Ketzenberg, and V.D.R. Guide, Jr., 2002. Capacitated remanufacturing with service level constraints. Production and Operations Management 11(2): 231-248.

Guide, Jr., V.D.R., and L.N. Van Wassenhove, 2002. The reverse supply chain. Harvard Business Review 80(2) February: 25-26.

Guide, Jr., V.D.R., and L.N. Van Wassenhove, 2001. Managing product returns for remanufacturing. Production and Operations Management 10(2): 142-155.

 Guide, Jr., V.D.R., 2000. Remanufacturing production planning and control: U.S. industry practice and research issues. International Journal of Environmentally Conscious Design and Manufacturing 9(2): 3-14.

 Guide, Jr., V.D.R., and V. Jayaraman, 2000. Product acquisition management: current industry practice and a proposed framework. International Journal of Production Research 38(16): 3779-3800.        

Guide, Jr., V.D.R., V. Jayaraman, R. Srivastava, and W.C. Benton, 2000. Supply chain management for recoverable manufacturing systems. Interfaces 30(3): 125-142.

        Reprinted in: E. Rhodes, JP Warren, R. Carter, Eds. 2006. Supply Chains and Total Product Systems: A Reader Blackwell Publishing, London, 365-380.

 Guide, Jr., V.D.R., 2000. Production planning and control for remanufacturing: Industry practice and research needs. Journal of Operations Management 18(4): 467-483.        

Guide, Jr., V.D.R., and R. Srivastava, 2000. A review of techniques for buffering against uncertainty with MRP systems. Production Planning and Control 11(1): 223-233.

Guide, Jr., V.D.R., R. Srivastava, and M. Kraus, 2000. Priority scheduling policies for repair shops. International Journal of Production Research 38(4): 929-950.

Guide, Jr., V.D.R., V. Jayaraman, and R. Srivastava, 1999. The effect of lead time variation on the performance of disassembly release mechanisms. Computers & Industrial Engineering 36(4): 759-779.

Guide, Jr., V.D.R., V. Jayaraman, and R. Srivastava, 1999. Production planning and control for remanufacturing: A state-of-the-art survey. Robotics and Computer-Integrated Manufacturing 15(3): 221-230.

Jayaraman, V., V.D.R. Guide, Jr., and R. Srivastava, 1999. A closed-loop logistics model for remanufacturing. Journal of the Operational Research Society 50(5): 497-508.

Guide, Jr., V.D.R., and R. Srivastava, 1998. Inventory buffers in recoverable manufacturing. Journal of Operations Management 16(5): 551-568.

Guide, Jr., V.D.R., R. Srivastava, and M. Kraus, 1998. Proactive expediting policies for recoverable manufacturing. Journal of the Operational Research Society 49(5): 479-491.

Guide, Jr., V.D.R., 1997. Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system. International Journal of Production Economics 53(1): 101-116.

Guide, Jr., V.D.R., R. Srivastava, and M. Kraus, 1997. Product structure complexity and scheduling of operations in recoverable manufacturing. International Journal of Production Research 35(11): 3179-3199.

Guide, Jr., V.D.R., and R. Srivastava, 1997. Repairable inventory theory: Models and applications. European Journal of Operational Research 102(1): 1-20.

Guide, Jr., V.D.R., and R. Srivastava, 1997. Buffering from material recovery uncertainty in a recoverable manufacturing environment. Journal of the Operational Research Society 48(5): 249-259.

Guide, Jr., V.D.R., and M.S. Spencer, 1997. Rough-cut capacity planning for remanufacturing firms. Production Planning and Control 8(3): 237-244.

Guide, Jr., V.D.R., R. Srivastava, and M. Kraus, 1997. Scheduling policies for remanufacturing. International Journal of Production Economics 48(2): 187-204.

Guide, Jr., V.D.R., and R. Srivastava, 1997. An evaluation of order release strategies in a remanufacturing environment. Computers and Operations Research 24(1): 37-47.

Guide, Jr., V.D.R., R. Srivastava, and M. Spencer, 1997. An evaluation of capacity planning techniques in a remanufacturing environment. International Journal of Production Research 35(1): 67-82.

Guide, Jr., V.D.R., R. Srivastava, and M. Spencer, 1996. Are production systems ready for the green revolution? Capacity planning in remanufacturing. Production and Inventory Management Journal 37(4): 70-76.

Guide, Jr., V.D.R., 1996. Scheduling using drum-buffer-rope in a remanufacturing environment. International Journal of Production Research 34(4): 1081-1091.

Guide, Jr., V.D.R., 1995. A simulation model of drum-buffer-rope for production planning and control at a naval aviation depot. Simulation 65(3): 157-168.

Guide, Jr., V.D.R., and G. Ghiselli, 1995. Implementation of drum-buffer-rope at a military rework depot engine works. Production and Inventory Management Journal 36(3): 79-83.

Guide, Jr., V.D.R., and M. Spencer, 1995. An exploration of the components of JIT: Case study and survey results. International Journal of Operations & Production Management 15(5): 72-83.